Bander abas Refinery Development and    Revamping Project 
Name of Project Esfahan Refinery Development and Revamping Project
Contract No. PNA/73-86-836
Contract Period 42 months
Client Bander abas Oil Refinery Company
Design & Construction Contractor Pier Group, Tarh-o-Palayesh, Maysun Joint Venture

1. General
            Bander abas was constructed and    put into operation in 1979 by Fuor-Thyssen Consortium on a plot of land with    an area of 400 hectares, located along the road to Tehran and 5 km distant    from Esfahan, to process the crude light oil coming from Bander    abas -Maroon    oil fields. Esfahan refinery consists of two parallel trains, each producing    a rated capacity of 100,000 bpd. Each existing train of the refinery consists    of two plants, one for the distillation, and the other for the catalyst    conversion. The units of CDU, VDU, LPG, and VIS Breaker… are located in the    distillation plant, and the units of Plat Former, Unifier, Isomax,    Hydrogen…are located in the catalyst conversion plant.
            Bander abas Oil Refining    Company intends to increase its oil refining capacity up to 360,000 bpd. To    this end, the sub-project package “B” called “Bander    abas Refinery Development and Revamping Project” specified by the    following table of project features was assigned to a joint venture of Pier    Group Co., Tarh-o-Palayesh, and Bander abas. By this project,    not only the capacity of Esfahan Oil Refinery will be increase, but also some    parts of Esfahan Refinery will be revamped and the entire control system of    the Refinery will be equipped with the electronic systems.

Pier Perltite, Bander abas Joint Venture have    taken necessary measures to fulfill their contractual obligations on design,    procurement, and construction of the undertaken Project.
        This    Project is deemed significant and complicated because the Project works have    to be continued simultaneous with the regular capacity operation of Esfahan    Refinery which is one of the largest refineries in Iran. Construction of such    significant and complex task project demands special professionalism and care    to be taken for safety and HSE measures, which will be meticulously    accomplished by the Joint Venture of Pier Group
        2. Project Scope of Work
        2.1. Sub-Project B1
        The    scope of work for Sub-Project B1 includes construction, installation    and                 pre-commissioning of the new units and buildings as follows:

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         


               No.

Description

Unit No.

Capacity

1

Distillation Unit - 3rd CDU Unit

71

120,000 bpd

2

3rd LPG Unit

75

9,809 bpd

3

Kerosene Treating Package

85

27,000 bpd

4

New Flare Unit

25

3,030 T/H

5

Substation and Switch Gear

SS26

-

6

Process Interface Building

PIB-05

-

     

2.2. Sub-Project B2
        The    scope of work for Sub-Project B2 includes revamping of the existing units and    systems as follows:

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     


               No.

Description

Unit No.

1

DU/VDU/SRG in both Trains

01-51

2

LPG in both Trains

05-55

3

Storage, Blending, and Transfer      System

20-50

4

Waste Water Treatment Unit

26

5

Fuel System

23

6

Water System

22

7

Air System

24

8

Steam and Power System

21

9

Nitrogen Distribution System

11

10

Interconnecting

45

     

2.3. Sub-Project B3
        The    scope of work for Sub-Project B3 includes change and replacement of the    control and protection system of the existing units (as detailed below) with    the advanced electronic systems to be substituted for the existing pneumatic    systems, and construction of four PIB buildings and one CCB1 building:

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   


               No.

Description

Unit No.

1

CDU/VDU/SRG of both Trains

01-51

2

LPG of both Trains

05-55

3

Unifier – Platformer of both Trains

02-52

4

Visbreaker of both Trains

03-53

5

Isomax of both Trains

06-56

6

Hydrogen of both Trains

07-57

7

H2S Removal and Amin treating of      both Trains

08-58

8

Sulfur Recovery

09

9

Nitrogen

11

10

Steam and Power

21

11

Water

22

12

Fuel System

23

13

Plant and Instrument Air System

24

14

Flare System

25

15

Waste Water Treatment

26

16

LPG Loading

30

17

Tankage Area

20

18

Special Solvent

19

19

Interconnecting

45

20

Control Building

CCB-1

21

Process Interface Building

PIB-01

22

Replacement of PIB2 Building by      Special Solvent Control Building (via correspondence PNA/002/91/18186

PIB-02

23

Process Interface Building

PIB-03

24

Process Interface Building

PIB-04