Project Overview
Beside design and construction of concrete fuel tank of omidiyeh power plant, Design and construction of 60,000 m3 concrete fuel tank of omidiyeh thermal plant was also awarded to pier Co.
BP has chosen concrete over steel to construct omidiyeh fuel tank, which is a better alternative in terms of initial and overall construction cost, construction time, acid corrosion, and construction safety. In order to increase speed and accuracy and reduce the cost, slip forming method was used to construct omidiyeh concrete fuel tank. To construct this project, more than 10,000 tons of reinforcement rebars and 22,000 m3 of concrete has been used.
Concrete fuel tank provides a safe fuel container for thermal plant to use and store enough fuel for some month in case of emergency.
This project started on 18, March, 2009 and was completed in 2011.

Key Facts
Concrete: 22,000 m3

Reinforcement rebar: 3,000 ton

 

Concrete Fuel Tanks of omidiyeh Power Plant

Project Overview

Engineering, procurement and construction of omidiyeh  concrete fuel tanks was awarded to pier Co. To construct this 60,000 concrete fuel tank project, more than 40,000 cubic meters of concrete was placed.

This national project is constructed to increase oil/fuel storage capacity of Iran for difficult times.

 

Key Facts

Concrete: 40,000

Concrete Crude oil Tanks of Omidieh

Project Overview

Concrete Crude oil Tanks of Omidieh are the first concrete storage tank for light and heavy crude oil which is designed and constructed in Iran. This project was awarded to pier   Co. as a Design, Procurement and Construction (EPC) project and consists of four concrete tanks with capacities of 500,000 and 1,000,000 barrels and their appurtenant structures such as pump stations.